27.07.12 Olympic Legacy – Elite Athletics Centre

The elite athletes outdoors events training centre was completed on time and on budget in the run up to the 2012 Olympics.

Plincke were appointed as co-ordinating consultants, organising a range of specialist including sports surfacing and lighting contractors.  The project, on the edge of Winchester’s ANOB required an LVIA and a full range of ecological surveys ahead of construction being given the go-ahead.